DEYE

DEYE GB-SL All In One solution, 10 kW inverter + 2 batteries + BMS, HV

Διαθέσιμο Αποστολή εντός 10 ημερών
5.199,16 € με ΦΠΑ
  • Κωδικός BUY ITBI-HWNVT
  • Κωδικόςdeye-gb-s10k-eu-2bb
  • Part numberGB-S10K-EU-2BB
  • ΚατηγορίαΦωτοβολταϊκά

Περιγραφή

Deye offers a new HV inverter system with energy storage in batteries, everything in one - All In One. This design features a 3-phase high-voltage hybrid inverter with output of 10 kW (0 to 5 kW per phase, overload capability of 100% for 10 seconds) and connection for 2 to 6 high-voltage batteries with a capacity of 4.09 kWh (voltage 102.4 V) and a maximum total capacity of 24.54 kWh (614.4 V). The user interface is enhanced with a color LCD display providing a user-friendly interface for overview and configuration of the system (battery management, AC/solar charging depending on various applications, etc.).

Key Features - INVERTER

  • Supports 3-phase asymmetric output
  • Number of MPP Trackers: 2 inputs (1+1)
  • PV input current: 20 A + 20 A
  • MPPT voltage range: 150 to 850 V
  • Option to connect 2 to 6 HV batteries in stack
  • Convenient control via app, computer, or touch screen
  • Unique Smart Load feature
  • IP65 protection degree - after stacking assembly
  • Beauty and elegance in a stackable design - floor mounting, no cables and additional mounting screws, quick and easy installation

Key Features - BATTERY

  • Capacity 4.08 kWh, total capacity 8.18 kWh
  • LiFePO4 battery
  • Nominal voltage 102.4 V (high voltage battery)
  • Up to 2 to 6 batteries can be connected to the inverters with a capacity of up to 24.48 kWh
  • Battery weight: 39 kg
  • Cycle life: 6000 cycles (25±°C, 0.5C/0.5C, DOD 90%, 70% EOL)
  • Operating temperature: Charging 0 - 55 °C / Discharging -20 - 60 °C
This inverter has successfully passed PPDS certification in categories A1 and A2 on May 27, 2025, at the Engineering Testing Institute in Brno. Based on these certifications, it can be permanently connected to the distribution network in the Czech Republic according to the regulations effective from January 1, 2025.

Package Contents

  • Hybrid inverter - 10 kW
  • BMS (GL-LB)
  • (2) batteries (GB-LM4.0)
  • Base